Deliverables
Public and sensitive deliverables
- PU
- Public — available for download
- SEN
- Sensitive — restricted access
| Deliverable | Title | Type | Access |
|---|---|---|---|
| D1.1 | Risk assessment report and quality plan | SEN | Restricted |
| D1.2 | Data Management Plan | PU | |
| D1.3 | IPR strategy report | SEN | Restricted |
| D1.4 | Project Management and Coordination Report | SEN | Restricted |
| Deliverable | Title | Type | Access |
|---|---|---|---|
| D2.1 | Thermal Characterization and Industrial Scenarios Report | SEN | Restricted |
| D2.2 | Thermophysical Reduced Order Model | SEN | Restricted |
| D2.3 | D2.2 Thermophysical Reduced Order Model | SEN | Restricted |
| D2.4 | Data Collection, Scenario Analysis, and Predictive Reliability Report | SEN | Restricted |
| D2.5 | System Architecture and Integration Flow Report | SEN | Restricted |
| D2.6 | Report on Barriers and Constraints | SEN | Restricted |
| D2.7 | Operational and Safety Guidelines | SEN | Restricted |
| D2.8 | Cybersecurity, Data Protection, and Access Management Report | PU |
| Deliverable | Title | Type | Access |
|---|---|---|---|
| D3.1 | Electrolyzer and SOEC System Design, Materials, and Safety Report | SEN | Restricted |
| D3.2 | Energy and Thermo-Energetic Analysis with TESS System Design | SEN | Restricted |
| D3.3 | Thermo-Hydraulic and Heat Transfer Analysis Report | SEN | Restricted |
| D3.4 | Experimental, Simulation, and Combustion Performance Report | SEN | Restricted |
| D3.5 | Process Digital Twin Prototype and Grid Integration Report | SEN | Restricted |
| Deliverable | Title | Type | Access |
|---|---|---|---|
| D4.1 | Electrolyzer Prototype and Assembly Documentation | SEN | Restricted |
| D4.2 | Heat Exchanger Performance Report | SEN | Restricted |
| D4.3 | BoP System Design and Performance Report | SEN | Restricted |
| D4.4 | Interface Design and EMS Integration Report | SEN | Restricted |
| D4.5 | Tests results report | SEN | Restricted |
| Deliverable | Title | Type | Access |
|---|---|---|---|
| D5.1 | System Installation Drawings and Equipment Package | SEN | Restricted |
| D5.2 | SOP Guidelines and Final Pilot System Integration Report | SEN | Restricted |
| D5.3 | Pilot System Design, Installation, and Operational Package | SEN | Restricted |
| D5.4 | EMS Validation report | SEN | Restricted |
| Deliverable | Title | Type | Access |
|---|---|---|---|
| D6.1 | Report on NZT integration in ceramic smelter | SEN | Restricted |
| D6.2 | Report on NZT integration in glass smelter | SEN | Restricted |
| D6.3 | Postmortem analysis and robustness of SOEC | SEN | Restricted |
| D6.4 | Technology scalability and integration | SEN | Restricted |
| Deliverable | Title | Type | Access |
|---|---|---|---|
| D7.1 | LCA report | PU | |
| D7.2 | Techno-Economic and Environmental Assessment Report | PU | |
| D7.3 | Social Impact and Operator Acceptance Report | PU | |
| D7.4 | Policy and regulatory environment report | PU | |
| D7.5 | Barriers to integration and needs assessment report | SEN | Restricted |
| Deliverable | Title | Type | Access |
|---|---|---|---|
| D8.1 | Plan for dissemination and communication activities and toolbox | SEN | Restricted |
| D8.2 | Multistakeholder Engagement and Clustering Report | SEN | Restricted |
| D8.3 | Skills gaps, training material and implementation | PU |
| Deliverable | Title | Type | Access |
|---|---|---|---|
| D9.1 | Replicability and roadmap strategy for technology document | PU | |
| D9.2 | Business Plan, Exploitation Report | SEN | Restricted |
| D9.3 | IPR Report | SEN | Restricted |